Venning Machine Factory ApS

We combine traditional craftsmanship with the latest technologies to ensure close customer contact and achieve the desired result in your project.

Solutions we have delivered

  • Drum system

    Installed at a customer in Belgium. The system has a capacity of up to 5,000 stones per hour and is designed to handle color mixing.

  • Mortar plant under assembly

    The plant is installed at a customer in Denmark and is capable of producing 14 tons of mortar per hour. The plant is built with its own drum sand dryer.

  • Fingercar/storage system

    The system is installed at a customer in Romania and consists of two identical systems, each located side by side in a separate building.

Fingercar

The system transports the boards with products from the elevator to the curing chamber and returns them to the dry side when the process is complete. It can be supplied with covered or insulated racks to ensure an optimal curing environment for the products.

Customer case

A new drum plant developed with four tilting stations that ensure gentle handling of bricks. The plant is designed to handle bricks in a wide range of sizes and also allows the integration of half and quarter bricks into the process. The plant has been delivered to a customer in Belgium.