Raise/lower Elevators
Couldn't load pickup availability
Description
Description
Venning Elevator for hardening rack system, consists of two elevator towers that are installed before a rack system with finger car system, in connection with block production.
Elevator 1 stacks up mold plates with newly molded products, ready for pickup by Fingercar. After products have been dried in the racking system, the dry products are delivered to Elevator 2, which stacks down mold plates with dry products. The mold plates are then ready for further transport in production.
Elevator lifts two molding boards at a time. Chains on the right and left sides are mechanically fixed in relation to each other, so chains will always have the same height on both sides.
Production
Production
Our production takes place both internally and with close partners, where we manufacture everything from individual components to turnkey, customer-specific solutions.
Using the 3D drawing program Autodesk Inventor, we ensure a precise and optimized production basis that minimizes errors and creates value for both the customer and Venning Maskinfabrik.
Project management
Project management
At Venning Maskinfabrik, we prioritize close customer contact and ensure professional design and project management throughout the entire process.
Our dedicated employees follow your tasks and projects from start to finish to deliver the best solutions.